For more details, see our privacy policy. 60 Charlotte Street. By continuing to browse the site, you are agreeing to our use of cookies. In September 2013, Make will be relocating from its studios at 55 Whitfield Street to take up short-term residence at Arup’s offices on Fitzroy Street. 80m2 of solar thermal panels will be installed to heat all of the domestic hot water, displacing energy consumption further.

635283, HEAD OFFICE & MANUFACTURING Building Type: Residential ; Commercial : Size: 35,300 sq m: Project Status : To be completed 2020: Work Area: Advancing Net Zero. Work is on site at the time of writing with completion scheduled for H1 2020. It has been designed by leading architects Make. London WC1E 7BT. The office cooling strategy incorporates Fan Coil Units (FCUs) mounted on the soffit. © 2020 UK Green Building Council. © Farrat Isolevel 2020.Registered in the UK, No. Andrew Reid have a Commissioning Management appointment direct to main contractor Multiplex for 420,000 sq ft of commercial office and 60,000 sq ft of high quality residential space. England, D/A/CH Regional Office The scheme will comprise 321,000 sq ft of commercial space, 45,000 sq ft of private and affordable residential, 14,000 sq ft of retail and a new public ‘pocket’ park. UK Green Building Council 20th Aug 2018 The project will purchase 100% renewable electricity and green gas.

For example, an all LED system for all the main office areas, coupled with DALI control equipment. Piercy&Company Architects. Client: Aberdeen Standard. Renewable energy. Whole life carbon. Daylight sensors allow light fittings to be automatically dimmed in response to ambient light levels, resulting in even lower energy consumption. It is a mixed-use development that will deliver 321,000 sq ft of commercial offices, 45,000 sq ft of residential apartments and 14,000 sq ft of retail space. Skip to main content. Cookie notice. London based architectural practice with a reputation for bold ideas, strong forms and carefully crafted buildings. Project overview. 80 Charlotte Street. The fan coil unit design is bespoke to suit the architectural finishes and to allow for a cleaner and more aesthetically pleasing soffit. Recycled content of materials like: concrete, steel, timber & derivatives, reinforcement is reported.

Read our, UBS Investment Bank - Project Storm, 5 Broadgate Fit-out, The Deerbrook Group - Sea Containers House, Lendlease - S5 and S6 The International Quarter, Buckingham - Northern European Data Centre Campus, Modern Slavery Act 2015 Transparency Statement. 80 Charlotte Street is a mixed-use development in Fitzrovia due for completion in 2019. For more information, please follow this link, © HDR | Andrew Reid & Partners 2020 - A HDR | Hurley Palmer Flatt Group Company, The HDR | Andrew Reid website may use cookies to improve your experience. It is retaining and re-using a significant proportion of the existing buildings, including the majority of the structural frames and the facades. 80 Charlotte Street has been designed by leading architect Make. Trench heating is at the perimeter, with heating coils included and fans to assist the pull of the fresh air. Registered charity number 1135153 A TM54 study was conducted to give an idea of the performance of the building.

80 Charlotte Street, Fitzrovia – image courtesy of Make Architects. An optimised façade design ensures a good balance between permitting daylight to enter the space, whilst limiting solar gain. The building has a Building Sustainability Plan which is the responsibility of our building managers during the operation of the building. Please note: the UKGBC office is closed until further notice, please contact the team via email. 80 Charlotte Street is a nine storey mixed-use scheme compromising 321,000 sq ft of offices, 45,000 sq ft of apartments (including 10,000 sq ft of affordable housing), 14,000 sq ft of retail and a new public park. The design incorporates low demand building services and fittings.

It has been designed by leading architects Make. Construction impacts. 80 Charlotte Street. A study was undertaken on what the embodied carbon would look like before commencing the project, and this is are being tracked throughout. This mixed-use scheme will comprise 332,000 sq ft of offices, 45,000 sq ft of residential (10,000 sq ft affordable housing), 3,000 sq ft of retail and a new public realm park. This move is only temporary and is prompted by Derwent London’s major redevelopment of 80 Charlotte Street, which Make is designing and includes its studio. The building is primarily heated using heat pumps. With the building topped out, we are now moving towards the final stages of the project. Operational energy use. We use cookies to ensure that we give you the best experience on our website. Advancing Net Zero. Make Architects May 2013. E: [email protected], COVID-19 UPDATE - Provisions we have in place to maintain the continuity of our supply, Anti-Vibration / Vibration Isolation Elastomers, Washers & Bushes, Support & Levelling of Industrial Machinery. Having undertaken detailed embodied carbon studies of the development, the embodied carbon footprint is estimated to be 685kg CO2e/m2, which compares with the benchmark figure of 1,000kg CO2e/m2 for a multi-storey office in London. This mixed-use scheme will comprise 321,000 sq ft of offices, 45,000 sq ft of residential (10,000 sq ft affordable housing), 14,000 sq ft of retail and a new public realm park. Farrat Switzerland AG,Nordhaus 3,5400 Baden, Switzerland, T: +44 161 924 1600 The Building Centre This mixed-use scheme will comprise 332,000 sq ft of offices, 45,000 sq ft of residential (10,000 sq ft affordable housing), 3,000 sq ft of retail and a new public realm park. Assisting Aberdeen Standard in realising the potential of this significant Fitzrovia asset, we developed a number of design solutions to maximise its commercial value. A mixed use office and residential development, featuring onsite renewables and using an embodied carbon target. Cheshire WA15 8HJ, Work is on site with completion scheduled for 2019. Located in Fitzrovia near London’s West End, the site is bounded by four streets. Location: Fitzrovia, London: Project Partners: Multiplex ; Derwent London Plc ; Make. Work is on site with completion scheduled for 2019. designed and developed by earth. To reduce the emissions, there is a sustainable procurement policy in place focusing on the following requirements: Use of materials with a high recycled content. Farrat Isolevel Ltd, These plans will record and monitor the electricity, gas, water and waste and will be regularly reviewed by sustainability team. Balmoral Road, This website places cookies on your computer to improve your experience. No personal information is stored. 26 Store Street